Overview and detailed guidance on the main types of contributions
Planning Policy CP7 Infrastructure and developer contributions
Introduction
This guidance updates the 2017 Developer Contributions Technical Guidance following Brighton & Hove City Council’s decision to introduce a Community Infrastructure Levy (CIL) that began on 5 October 2020. All planning applications agreed after this date that require the use of planning obligations have to comply with this guidance.
It provides up-to-date guidance on developer contributions, including:
- how each will be applied
- how the different types of contribution relate to one another
This guidance looks at the application of developer agreements outlined here:
- section 106 (S106)
- section 278 (S278)
- section 38 (S38)
The guidance sets out the types of mitigation and infrastructure that can be secured by S106 and CIL obligations. Specific infrastructure requirements to support the planned development of the city will be identified in the council's Infrastructure Delivery Plan (IDP).
The IDP is updated regularly. It's currently referenced as Annex 2 of the City Plan Part 1 (March 2016) and will be updated during 2021.
Details of all developer contributions secured by the council and how they will be spent will be provided in an Annual Infrastructure Funding Statement, which is a requirement introduced by the amended CIL Regulations 2010.
Developer contributions are sought in agreement with:
- relevant legislation
- national planning policy guidance
- policy objectives
as set out in the adopted development plan for Brighton & Hove, including the adopted City Plan Part 1 and saved policies from the 2005 Local Plan. It also includes:
- East Sussex, South Downs and Brighton & Hove Waste and Minerals Local Plan (2013)
- East Sussex, South Downs and Brighton & Hove Waste and Minerals Sites Local Plan (2017)
- Shoreham Harbour Joint Area Action Plan (2019)
City Plan Part 1 Policy CP7 Infrastructure and Developer Contributions indicates the range of infrastructure for which developer contributions may be sought. Contributions will go towards the suitable and acceptable social, environmental and physical infrastructure to ease the impact of new development and secure a successful development in planning terms.
All S106 commitments and CIL charges will be placed on the council’s local land charges register until they have been cleared.
Community Infrastructure Levy (CIL)
CIL is a non-negotiable financial levy that local authorities can charge on new development to fund infrastructure to support the planned development of the area. It is levied on new Gross Internal Area (GIA) floor space over 100 square metres or where there is the creation of a new dwelling.
How it's used
Unlike a S106 planning obligation, there does not have to be a direct relationship between the development from which CIL has been secured and how it is spent. CIL can be spent on infrastructure anywhere in the city or outside of the city’s administrative boundary should the authority consider that this would be beneficial infrastructure.
The key aim of CIL is to deliver infrastructure to support the planned development of the local area. The amounts to be charged for different types of development per square metre must be set out in an agreed CIL charging schedule. This is informed by tailored viability assessment and testing which has been reviewed through an examination in public. It's also necessary to demonstrate an infrastructure funding gap to ensure that there is a need. Details of the examination can be found on the Council’s CIL examination page.
The Infrastructure Delivery Plan (IDP) sets out the infrastructure required to support the development of the local plan. The IDP is regularly updated as infrastructure needs are identified and delivered. As CIL can be used to pay for infrastructure, this is a key document in identifying priorities.
CIL is non-negotiable and the CIL regulations state it should be paid within 60 days of beginning unless there's an agreed Instalments Policy which establishes alternative payment dates. You can find the council’s Instalments Policy in Appendix 1.
CIL Charging Schedule
View the Brighton & Hove CIL Charging Schedule.
NIL rated CIL sites
The CIL consultation process identified that 4 sites may not be viable for CIL, due to their specific abnormal costs of development. The Inspector who undertook the CIL examination process concluded that these sites would not be viable for CIL. They will still be required to enter into S106, S278 and/or S38 agreements as appropriate to secure site-specific infrastructure and to make the development acceptable in planning terms.
Viability
Development viability
Developer contributions are a necessary cost of development and it's expected that these requirements are factored into the development proposal at an early stage in the same way as all other costs.
When developers consider that schemes may not be viable, these issues should be raised as soon as possible and detailed viability and cost information should be submitted to the council for independent assessment and review. It's a local validation requirement that, if you're unable to meet your planning obligations, you must submit a viability assessment with your planning application. This helps reduce any delay in negotiations and agreeing the final S106 legal agreement to provide site specific planning obligations.
The burden is on the developer to provide strong evidence to show the non-viability of a development proposal. To support a claim, the council will require a full financial appraisal through an informed and independent assessment of viability signed by an appropriately qualified and independent valuer or financial professional. An independent assessment cannot provide binding arbitration, but the council will consider its findings in considering viability issues on applications.
In all cases the council requires an electronic version of the viability assessment tool in a working compatible format to test calculations and the figures provided.
Review mechanism
In meeting planning policy objectives for ensuring the right levels of contributions, you may require a review mechanism. This is often where the council has agreed reduced contributions due to viability issues at the time of determining the planning application.
Such a mechanism allows for re-evaluation of the viability of the scheme and an increase in the level of developer contributions to be provided where, for example land value assumptions may have been fixed at an early stage or an un-predicted rise in sales/revenue values. The council expects the developer to pay all the council’s verification costs in making any assessment and reassessment.
S106 and its relationship with CIL
CIL does not necessarily replace the requirement to have a S106 agreement, if one is required. In some circumstances you can request both for the same development site. A S106 obligation is for site specific mitigation, to make the proposed development acceptable and to provide for specific on-site policy requirements. CIL provides funding for city-wide infrastructure improvements required because of demand from all new developments.
Prior to the introduction of CIL, many S106 agreements requested contributions to mitigate matters which were site related but which were also sometimes provided for in the vicinity of the site such as:
- sustainable transport improvements
- public realm improvements
- education provision
With the introduction of CIL, S106s will be considerably scaled back to being site specific and CIL will be collected to pay for off-site infrastructure improvements and to address the cumulative impacts of development.
The government guidance note on CIL states:
‘The levy is not intended to make individual planning applications acceptable in planning terms. As a result, some site-specific impact mitigation may still be necessary for a development to be granted planning permission. Some of these needs may be provided for through the levy but others may not, particularly if they are very local in their impact. There is still a legitimate role for development specific planning obligations, even where the levy is charged, to enable a local planning authority to be confident that the specific consequences of a particular development can be mitigated’.
See: Community Infrastructure Levy
Differences between CIL and S106
CIL is a non-negotiable financial levy or charge on specific types of development as set out in the adopted CIL Charging Schedule. It has been strongly tested for viability, through the preparation and examination process. CIL is a clear and transparent method for developers and others to calculate the amount of CIL which will be levied on the development site. CIL costs can therefore be factored in at a very early stage in the feasibility process.
S106 planning agreements are negotiable, with varying costs depending on the precise development proposal and requirements for the site. Contributions can be financial and non-financial. CIL liability only arises if on completion the total internal area of new build will be over 100 square metres or where the chargeable development comprises one or more dwellings.
S106 financial requirements are traditionally determined by reference to proposed units and estimated occupancy and mainly on major applications of sites over 10 units more and large non-residential sites.
CIL:
- is captured on much smaller sites than the threshold used for S106 liable planning applications
- cannot be used for the provision of affordable housing, which can only be secured through S106
S106 is used to secure affordable housing both on site and for commuted sums for the provision of affordable housing off-site.
S106 financial contributions must be spent on site specific infrastructure. There must be a relationship between the development and where and how the money is spent. The agreement will specify the precise nature of how the financial contribution will be spent.
CIL is a levy on liable development which is used to provide infrastructure across the whole city. There does not have to be a relationship between the development which generated the CIL and where it is spent.
A charging authority must apply CIL to fund the provision, improvement, replacement, operation or maintenance of infrastructure to support development within its area. (Reg 59)
There are two main types of CIL spend:
- strategic infrastructure
- non-strategic (neighbourhood portion)
The strategic portion does not have to be spent on or near the development which generated the CIL, whereas the non-strategic portion should be spent in the local area.
The council will agree and publish on the website governance arrangements for approving both the expenditure of the strategic infrastructure element and the neighbourhood portion, outside of the area represented by Rottingdean Parish Council.
Types of infrastructure to be funded by CIL
CIL is a charge on liable development which can be used to provide infrastructure across the whole city to address the cumulative impacts of development.
The CIL regulations set out that CIL can be spent on the provision, improvement, replacement, operation or maintenance, of infrastructure to support the development of the local area.
As part of the preparation of the Council’s CIL Charging Schedule, the list below shows the types of infrastructure or project that CIL receipts can be spent on.
Air quality
All off-site city-wide air quality mitigation and monitoring measures priorities where identified in Infrastructure Delivery Plan.
Education facilities
All off-site provision and improvements to new or existing:
- schools
- public sector funded education facilities
Emergency services
Cumulative impacts of development upon services where identified in Infrastructure Delivery Plan.
Energy and utilities
Strategic renewable energy projects, measures and facilities provision where identified in Infrastructure Delivery Plan.
Flood risk management
Strategic Sustainable Urban Drainage Systems (SuDS) surface water flooding. Priorities where identified in Infrastructure Delivery Plan.
Health facilities
Off-site city-wide health care facilities provision.
Open space provision
All off-site provision and improvements to publicly accessible parks and other recreation open space facilities including:
- amenity green areas
- areas for food growing
Recreation space built facilities
All off-site provision and improvements including:
- built provision to play space
- indoor and outdoor sports
- playing fields
Provision and enhancement of Green Infrastructure network
Green infrastructure network connectivity including:
- cross boundary infrastructure
- rights of way
- biodiversity measures
- tree planting
Public realm and cultural infrastructure
Strategic public realm upgrade including:
- environmental improvements
- components for delivery of arts
- cultural provision
- production space and technology
Transport and highways
City-wide transport improvements including:
- walking and cycling facilities and networks
- public transport facilities and services
- road safety
- parking and traffic management
Off-site provision, improvement and maintenance to new and existing public highways infrastructure and rights of way including:
- traffic signals
- junction upgrades
- lighting
The alphabetical order of the list does not imply any preference or priority, but is derived from objectives in approved council strategies and plans and detailed in Annex 2 of the Brighton & Hove City Plan Part 1 - Infrastructure Delivery Plan update 2017 which identifies infrastructure required to support development over the plan period to 2030.
See Development Plans.
The inclusion of a specific infrastructure type on this list does not commit the council to fund the project, either in whole or in part, through CIL, it merely provides an indication of the type of project.
The precise way in which the CIL receipts have been spent will be set out in an Annual Infrastructure Funding Statement which is a requirement of the 2010 CIL Regulations as amended. This states that charging authorities must prepare and publish an annual Infrastructure Funding Statement (IFS) which:
- identifies the amount of developer contributions (including non-monetary) the council has received from both CIL and S106
- what it proposes to spend them on
- what it has actually spent contributions on each financial year
Types of infrastructure to be funded by S106
CIL and S106 will exist alongside each other. Developer contributions for nil rated CIL sites will be expected to sign a S106, S278 and/or S38 as appropriate to the site. Most major development sites, such as sites of 10 or more residential units, will be subject to CIL and S106, whilst smaller residential sites are likely to only be CIL liable.
Where appropriate, developers and land owners will still be expected to provide site-specific infrastructure which is:
- necessary to make the development acceptable in planning terms
- directly related to the development
- fairly and reasonably related in scale and kind to the development
The council will seek S106 obligations, for on-site and site specific matters that are required to make the development acceptable in planning terms.
The list below reflects what was set out as part of the preparation of CIL to identify what S106 agreements would continue to secure:
- affordable housing - on-site provision for development of 10 net units and over
- affordable housing - for sites of between 5 and 9 net units the council will request a commuted sum instead
- on-site recreation and sports facilities and open space provision where required by site specific policy allocation
- on-site schools and education land and building provision where required by site-specific policy allocation
- development related transport access, trunk roads and highways works provision under S278 and S38 of the Highways Act 1980
- on-site transport and accessibility provision where required
- on-site Local Employment training and job opportunities provision with supporting financial contribution
- on-site public realm provision including artistic element
- development related flood defences and coastal engineering including site-specific policy allocation mitigation
- development related water supply and utilities provision, and waste water drainage
- on-site health care facilities, emergency services facilities, and other community buildings
- development related nature conservation and ecological measures
Contributions which will no longer be secured from S106
In line with the types of infrastructure to be funded by CIL, the items below show areas for which the council previously secured S106 contributions which will be scaled back from 5 October 2020. S106 contributions for the following off-site works will now be provided through CIL:
- off-site recreation space contributions
- off-site education provision contributions
- off-site sustainable transport contributions
Calculations and formulas for S106 contributions
In the majority of cases the actual cost of what will need to be provided for on-site will be calculated by the relevant department. The planning application case officer will share this with the applicant.
For affordable housing sums in lieu and the Local Employment and Training Scheme which specifically refer to a financial contribution, the formulas from the 2017 technical guidance remain in place. For all other areas there are no formulas, but an indication of the type of contributions that will be expected.
Agreement to the overall contribution will be subject to negotiations with the developer before and during the planning application process.
Affordable housing
In accordance with Policy CP20 in City Plan Part 1 on-site provision of affordable housing is the council’s first priority for all suitable larger development sites.
This is:
- 40% on sites of 15 net units or more
- where achievable, 30% on sites of between 10 and 14 net units
Alternative Developer Contributions / Commuted sums for affordable housing
Off-site provision of affordable housing on an alternative site or by way of a financial payment instead (or commuted sum) will only be acceptable in exceptional circumstances or where between 5 and 9 net units are being provided.
Off-site provision / Commuted sums for larger development sites
Following Policy CP20 in the City Plan Part 1 on-site provision of affordable housing is the council's first priority for all suitable larger development sites. This is:
- 40% on sites of 15 units or more
- where achievable, 30% on sites of 10 to 14 units
Off-site provision of affordable housing on an alternative site or by way of financial payment instead of (or commuted sum) is only acceptable in exceptional circumstances.
There will need to be strong planning or housing reasons to accept off-site provision or a commuted payment on larger development sites. Such justification will need to be made carefully as the presumption will remain for on-site provision unless scheme-specific circumstances indicate otherwise.
This is a matter for the developer to demonstrate and for the planning authority together with strategic housing services to consider and agree.
Circumstances which might justify off-site provision or a payment instead could include the following.
Alternative location
Where mixed community objectives/housing priorities could be better met in an alternative location. For example, where family-sized (3 or more bedrooms, outdoor space) housing cannot easily be provided for on the development site itself, then it may be preferable to seek offsite provision or a commuted sum to fund such affordable housing elsewhere.
High housing costs
Where there are high housing costs for occupiers associated with the development. For example, in high-value areas where development leads to high service/maintenance charges and where this cannot be satisfactorily overcome or avoided by alternative design, massing or separate new build for affordable housing.
Unable to provide affordable units
Where a Registered Provider finds it uneconomic or impractical to provide the affordable units agreed. An example could be where on some sites it is not practical, from a management perspective, to provide and manage a small number of on-site affordable housing units.
It's important to note that economic viability is not the key test for whether there should be on or off-site provision.
Viability determines the overall amount of affordable housing contribution. That's the appropriate percentage overall and the type, such as tenure, size mix, of affordable housing sought, whether:
- provided on-site
- provided off-site
- or as a commuted payment
Neither off-site provision nor financial contributions will be a less expensive option than on-site provision but will be equitable. In such circumstances where the proportion of affordable housing is being negotiated, the council may require the development’s financial information to be provided on an open-book basis which will be required as part of the process.
Calculation
Where the case is agreed for accepting a payment in lieu of onsite provision, the calculation of the commuted sum will follow the same approach as set out for smaller development sites:
- 5-9 units
- or sites of between 10 to 14 units
Off-site provision on an alternative site
Where the case for no on-site provision is agreed, then the council may consider off-site affordable housing provision on an alternative development site. An example may be where a private developer can pair-up development sites.
Provision of affordable housing on an alternative development site will be in addition to any requirement arising from the development of the alternative site. Where an alternative site is insufficient in area to accommodate all the affordable housing requirement then financial contributions to remedy the shortfall will be sought.
Commuted sums on small development sites for affordable housing on sites of 5 to 9 net units and 10 to 14 net units
This guidance sets out the revised methodology and calculation of commuted sums (payment in lieu) in accordance with the sliding scale requirements for smaller development sites as set out in City Plan Part 1 CP20 Affordable Housing.
The Brighton & Hove City Plan Part 1 was adopted on 24 March 2016. The City Plan sets out strategic housing policies regarding future housing delivery in the city to 2030. Policy CP20 Affordable Housing replaces the 2005 Local Plan Policy HO2 for affordable housing.
Policy CP20 Affordable Housing requires an affordable housing contribution on all sites of 5 or more net units:
- 20% affordable housing as an equivalent financial contribution on sites of 5 to 9 net dwellings
- 30% on-site affordable housing provision on sites of 10 to 14 net dwellings or as an equivalent financial contribution
- 40% on-site affordable housing provision on sites of 15 or more net dwellings
The table below shows the equivalent number of affordable housing dwelling units for which a commuted sum would be required under Policy CP20. The numbers have been rounded to the nearest whole dwelling unit. This reflects the policy approach which is currently taken for onsite provision.
For example:
- for a scheme proposing 6 dwelling units, the equivalent number of affordable housing units for which a commuted payment would be sought is 1 unit
- for 9 dwellings, the equivalent number of affordable housing units for which a commuted sum would be sought would be 2 units
Sliding scale of affordable housing contributions Policy CP20
Number of units | 20% affordable housing - equivalent number of units |
30% affordable housing - equivalent number of units |
||
---|---|---|---|---|
20% | Rounded | 30% | Rounded | |
5 | 1 | 1 | ||
6 | 1.2 | 1 | ||
7 | 1.4 | 1 | ||
8 | 1.6 | 2 | ||
9 | 1.8 | 2 | ||
10 | 3 | 3 | ||
11 | 3.3 | 3 | ||
12 | 3.6 | 4 | ||
13 | 3.9 | 4 | ||
14 | 4.2 | 4 |
Commuted payments calculation
The general approach to the calculation of the commuted payment remains essentially the same as that currently outlined in the original Developer Contributions Technical Guidance as first established by Environment Committee February 2011.
The commuted payment will be based on a sum equal to the difference between an Open Market Value (OMV) and Affordable Housing Value (AHV).
Brighton & Hove City Council commissioned DVS Property Specialists to undertake the relevant valuations required in 2017 and from this to provide a schedule of commuted sum payments.
DVS were instructed to provide:
- a schedule of average market values for 1 to 3 bedroom flats and 2 to 4 bedroom houses across Brighton & Hove
- an analysis of different value areas in Brighton & Hove - low, medium and high
- a schedule of average affordable housing values for the above unit types
- a schedule of commuted sum payments
The council will review these figures annually or as appropriate in line with changes in market conditions.
See: Affordable housing guidance - Commuted Sums and Vacant Building Credit
Taking account of unit size mix
The appropriate unit size mix for the affordable housing contribution will be advised having regard to the balance of unit sizes across the proposed scheme as a whole. The commuted payment will then be calculated using the schedule above.
Example 1: 6 residential units comprising 4 one bed and 2 two bedroom units
The affordable housing contribution will be based on a commuted sum equivalent to 1 affordable unit as shown in the table above. As the scheme is balanced more towards 1 bedroom units overall then the commuted payment will be that calculated for a 1 bedroom unit reflecting the appropriate value zone. For a flatted scheme in Zone 2 this will be £120,750.
Had the scheme comprised an even split of one bedroom and two bedroom properties then the commuted payment sought would be for a one bedroom unit.
Example 2: 9 residential units comprising 4 one bedroom units, 4 two bedroom units and 1 three bedroom units
Under this example, the appropriate affordable housing contribution for which a commuted sum would be secured would be equivalent to 2 affordable units as indicated in the table above. The commuted payment would be calculated on the basis of 1 one bedroom unit and 1 two bedroom unit reflecting the appropriate value zone. For a scheme of 9 flats in Zone 2 this will be £285,250.
Securing the commuted payments and proposed uses
Developers have the option to secure commuted payments or a proposed use through either a Unilateral Undertaking or a S106 Agreement. Payments will be required upon scheme commencement.
Applicants are advised to confirm the appropriate commuted sum with a planning officer. It's proposed that the council would use commuted payments to fund the provision of affordable housing in the city in the following ways:
- to contribute to the costs of building new affordable housing
- to contribute to the costs of area regeneration in connection with council owned land that would provide new affordable housing
- to contribute to the costs of purchasing land or properties either off-plan or existing buildings for as new affordable housing
- to contribute to the cost of bringing long term empty homes back into use as affordable housing
- to buy back former council owned homes sold under the Right to Buy under the council's Home Purchase Policy
The approach for accepting a commuted sum in lieu is that financial contributions should be of ‘broadly equivalent value’ . The commuted sum should be equivalent to the developer or landowner contribution if the affordable housing was provided on-site.
In such circumstances where the proportion of affordable housing is being negotiated the council may require the development’s financial information be provided on an open book basis which will be required as part of the process.
This guidance will be incorporated into the council’s Affordable Housing Brief. Guidance may be introduced regarding Build to Rent schemes in the future.
Transport
Development-related transport access, trunk roads and highways works provision under S278 and /or S38 of the Highways Act 1980
Off-site transport provision
Following the introduction of CIL, the majority of new off-site transport provisions such as:
- new traffic signals
- junction improvements
- new bike hubs
- other sustainable transport measures
will not be subject to S106 contributions, but funded through other council programmes such as the Local Transport Plan and CIL.
Improvements and changes to the public highway may be necessary to ensure that access to and from a site is acceptable.
This will include how it is joined to the public highway and any alterations or relocation required to highway assets adjacent or opposite to the site, as defined by the red line boundary in the planning application, that are directly required because of the development of the site.
Obligations will also be secured for future maintenance payments where reasonable.
Examples of the type of off-site contributions that may be required include:
- relocating an existing bus stop that is no longer in a safe location due to the new development, but excluding the costs of any upgraded provision for shelters, real time bus information not provided by the current facility
- upgrading and repairs to the footpaths adjacent to the site to maintain public amenity
- amendments and improvements to those parts of existing cycle paths that are located adjacent to the development
- provision of additional spaces and cycles in existing adjacent Bike Hubs when linked to a site travel plan, but excluding the costs of providing new Bike hubs
Developers may also wish to propose the inclusion of contributions for the cost of making other alterations to the public realm to improve the overall appearance and amenity of the wider setting in which their development is situated.
On-site transport provision where required
Any transport-related works required on-site will be the responsibility of the developer and will be secured via an S106 agreement.
Agreement to specific measures and the overall contribution will be subject to negotiations with the developer before or during, the planning application process.
Examples of the type of on-site contributions that may be required include:
- works to overcome issues relating to the site layout or permeability
- schemes to improve the management of traffic and parking on site, including any extension of an existing CPZ to cover new dwellings being created
- on-site works to provide for and encourage the use of sustainable forms of travel including pedestrian, cycle and buses, such as bus stop improvements
- on-site measures that improve safety and reduce or prevent casualties
- cycle parking and provision of new bike hubs
- electric vehicle charging points and enabling infrastructure
- on street parking controls
- CCTV
- street lighting
Implementing works
These works will be secured through a S106 agreement and implemented either through Section 278 or S38 Highways Agreements.
If highway works are to be carried out on the public highway by a developer, the council as Highway Authority will enter into a legal agreement under Section 278 of the Highways Act 1980.
If new estate roads are to be constructed and then adopted as public highways, the council as Highway Authority enters into a Section 38 agreement under the Highways Act 1980.
This agreement allows the developer to build the new roads under council supervision once the full construction details are agreed upon.
These agreements allow developers to carry out highway works at their expense whilst insuring the council against poor or incomplete workmanship.
A bond covering the full costs of the works will be secured and released on completion of the works to the council’s satisfaction. The developer will be required, to pay for maintenance for a minimum agreed period following completion of the works after which the council is then responsible
Travel Plans
The justification for seeking obligations in respect of Travel Plans is set out in:
- Paragraph 111 of the NPPF
- Policy CP9 of City Plan Part 1
- Policy DM 35 of the emerging City Plan Part 2
The starting point for a Travel Plan is a Transport Assessment which shows the issues. The Travel Plan puts forward specific objectives to address these issues in relation to access and sets out all the measures to be implemented in detail, with:
- an action plan
- timescales
- targets and responsibilities for implementation, monitoring and review
Where a development may cause significant amounts of movement it may be possible for a travel plan to address these and reduce them to acceptable levels.
The type and scale of development that will normally trigger the requirement for a Transport Assessment or Transport Statement and Travel Plan can be found in Policy DM 35 of the emerging City Plan Part 2.
Travel plans secured under a S106 will be for no more than 5 years from the date of occupation. Developers may apply for them to be discharged as a condition sooner if sufficient evidence can be supplied that demonstrates the modal shift objectives contained in the plan have been met.
The estimated cost of the proposed travel plan measures to be included in the S106 will be considered as part of any viability assessment (and subsequent reviews) that the council requires following the viability section of this guidance.
The cost elements that will be used to calculate the value of the travel plan obligation can be calculated using the following methodology.
Cost elements | Value of the travel plan |
---|---|
Travel subsidies (Easit discount schemes, free bus or train tickets, car club credits etc as agreed) | Lump sum per dwelling/new full-time job created |
Provision of formal cycle training to residents and employees of the development | Lump sum per trainee (number of trainees calculated as 5% of the number of cycle spaces required by BHCC Parking Standards |
Provision of cycle maintenance tools and equipment | Lump sum per cycle space required by BHCC Parking Standards (Lump Sum) |
Provision of Doctor bike sessions | Lump sum (based on 2 sessions per annum for 5 years) |
Provision of a Travel Plan Coordinator (including co-ordination of Bicycle User Group, production of travel packs, administration of free/discounted travel, travel planning advice & maintenance of site travel information | Lump sum (fixed cost per annum for 5 years) |
TRICS SAM Surveys | Lump sum (assumes a fixed fee per survey undertaken for 5 surveys over lifetime of development) |
Management and monitoring fees to cover:
|
Published set of fee charges using appropriate mechanism (lump sum or fee percentage as appropriate) |
This sum will then be capped as the overall contribution charged for travel plans in the S106, although it will be subject to RPIX indexation in accordance with CIL & S106 Management, monitoring costs and indexation.
A worked example of this calculation and the current lump sum rates that developers should use are published on the CIL pages of the HCC website.
The first travel plan should be submitted at least 3 months before the first occupation of the development, along with full payment of the agreed obligation (including the management and monitoring fees.)
The developer will be required to submit with each subsequent revision of the agreed travel plan full information on the expenditure that they have incurred in commissioning, managing and delivering the various travel plan initiatives funded through this obligation. This includes any information where a different expenditure pattern is emerging, such as lower than estimated take-up of free bus travel or demand for additional bike maintenance schemes, to ensure that the plan continues to meet the needs of the occupants of the development.
All revenues generated from the fees for each travel plan obligation will only be used by the council for monitoring and managing that specific S106 agreement.
For some development, a travel plan implementation bond may be required as part of a planning obligation. The travel plan implementation bond acts as surety against failure by the developer to implement the travel plan.
The bond is based on the cost of implementing the travel plan, which is to be calculated by the developer. The timescale on which the bond is based covers 5 years but can vary depending on the phase of the development.
Where bonds are secured, the travel plan will be monitored annually, with one-fifth of the bond, depending on the development phase, released back to the developer if the travel plan is successfully implemented.
If the developer fails to implement the travel plan then the council may use the bond to deliver the travel plan measures.
For large development, see Appendix B of the Department for Transport’s: Guidance on Transport Assessment (2007), or development located in existing areas where there are transport problems, a travel plan target bond may be required in addition to the implementation bond.
An annual target to reduce vehicle use and increase sustainable transport will be agreed between the developer and the council. If annual monitoring shows that targets have not been met, part of the bond will be called upon by the council to address the situation.
If targets are partially met then a percentage may be deducted from the bond and provided back to the developer, with the rest being used to tackle unmet areas. The travel plan target bond may be secured through a planning obligation.
Local employment
On-site local employment training/job opportunities provision with supporting financial contribution
As part of the objectives of City Plan Part 1 Policy CP2 (and SA6 Sustainable Neighbourhoods), the following opportunities for local residents will continue to be sought from developers on major development schemes:
- apprenticeships
- training opportunities
- job opportunities
City Plan Part 1 Policy CP7 Infrastructure and Developer Contributions aims to ensure adequate infrastructure including appropriate social infrastructure through the provision of employment, regeneration and training initiatives on major development sites at demolition and construction phases following the Brighton & Hove Local Employment Scheme (BHLES).
The Brighton & Hove Local Employment Scheme (BHLES)
The council is keen to ensure ongoing developer support for the provision of local training and employment agreements for all major developments.
Major development proposals will be required to provide direct provision of employment and training initiatives by the developer together with a financial contribution towards an agreed and established programme with a local partnership.
The training is for the benefit of the construction industry as a whole, to mitigate the impact of the predicted skills shortage in the sector and is necessary to meet policy objectives in respect of Social Infrastructure in providing suitably trained individuals required for demolition or construction services for new development.
The training provision would be for people living within the administrative boundary of Brighton & Hove, and directly related to the employment needs of the development to increase opportunities to develop local skills and business performance and expand employment provision.
Seeking contributions for training co-ordination benefits all parties by:
- providing employment
- providing training
- enabling sustainable development
- mitigating the potential for delays to the construction process
A local workforce will enable easier recruitment and retention and will reduce the environmental impact of a commuting workforce.
The advertising of all jobs, which relate to the development, should be accessible to local people through local, approved employment agencies such as Job Centre Plus and its partners.
An obligation will secure contributions towards the city-wide coordination of training and employment schemes to support local people to employment within the construction industry.
The development will also directly contribute towards a workplace coordinator who facilitates easier routes to employment with contributions directly relating to the construction of developments and training for local people benefiting the city’s major development sites across the city.
The methodology for securing contributions towards employment and training will enable the council and delivery organisations to:
- engage in long-term planning of the scheme
- educate residents and trainees, who are then able to develop their skills and qualifications both on and off-site
- support developers in achieving a commitment to local employment and training
- support the development industry
- support long-term monitoring and compliance with obligations
A planning obligation for employment and training may include several elements such as:
- a contribution by the developer towards before and after construction training
- a commitment to recruit residents for jobs before and after development
- the provision of waged construction training placements on the development site
- larger schemes to include the provision of a serviced, on-site recruitment and/or training facility and/or workplace coordinator
- the provision of information that the council can use to monitor the success of the scheme
- the developer to enter into a partnership with a local college or training provider
- a dedicated Local Employment Scheme Coordinator
How financial contributions are calculated for the BHLES
Financial contributions will be required to support the on-site training provision aided directly through the role of the Local Employment Scheme Coordinator and a local employment training off-site programme and its running costs, including the provision of an appropriately qualified tutor.
The contributions will support both capital and revenue costs on the Futures programme for residents and small businesses.
Threshold and provisions
Contributions will be required from all new major developments including net gain provision on conversion and change of use, on or above the thresholds detailed below.
Provision of contributions on all development will need to be agreed upon in detail by the council and the developer and be met before the commencement of development.
All developments will provide an agreed percentage (a minimum of 20%) of local employment on-site and provision of training opportunities in negotiation with the Local Employment Scheme Coordinator.
Residential development contributions
All residential uses | Student/studio units | 1 to 2-bed units | 3 or more bed units | Note | |
---|---|---|---|---|---|
Contribution per unit (schemes of 10 units and above) | £100 | £300 | £500 | Falling under Use Class C1 | |
£100 | £300 |
|
Falling under Use Class C2 and Sui Generis (Hostel) |
Non-residential development contributions
Type of development | Threshold | Contribution | Note |
---|---|---|---|
All uses (except see below) | 500m2 | £10 per m2 | All Use Classes except B2 and B8 |
Storage or distribution/general industrial | 235m2 | £5 per m2 | Falling under Use Classes B2 and B8 |
Example of development contribution
750 metres squared B1 commercial space x £10 per metres squared = £7,500.
50 x student /studio units x £100 per dwelling =£5,000.
The proposed thresholds and formula applied would be negotiated taking into account wider considerations linked to the development of the scheme.
CIL & S106 management, monitoring costs and indexation
CIL management and monitoring fee
The CIL Regulations state that up to 5% of CIL receipts can be spent on administering the Community Infrastructure Levy. This will pay for:
- dedicated CIL officers to monitor and manage the scheme
- specific software to assist with the administration
S106 – Management and monitoring fees
Management of Section 106 Agreements
The council starts managing and monitoring each S106 agreement from the moment it's signed. This is a complex process as the individual S106 agreements contain different trigger points and obligations.
The council employs a dedicated CIL & S106 monitoring team to oversee this complex programme and ensure compliance with, and ultimately the delivery of, the obligations secured through S106 agreements.
The council has an established process for recording and monitoring S106 agreements and other relevant legal agreements, including a database with details of all agreements
To ensure the efficient operation of the S106 process the council will:
- monitor all ‘trigger points’ (stages of development)
- ensure that benefits and/or monies identified in the Agreements appropriate to that trigger are secured
- manage the receipt of monies and the setting up and monitoring of the bespoke accounts relating to each mitigating project
- procure the required works from third parties where necessary; and manage the spending of S106 money and infrastructure delivery
To compensate for any loss of value of received S106 receipts arising from inflation, and pending expenditure all monies received will be held in interest-bearing accounts.
Any interest accrued will be applied by the council to S106-related projects.
Specific numerical information relating to prices, formulas and, subsequently, the level of contributions due will need to be updated regularly so that the document remains relevant. The changes will be published in the Annual Monitoring Report.
Any amendments to fee schedules will also be published on the website.
Financial obligations
Where an S106 agreement contains a financial obligation, details of how to make the payment will be provided on the demand notice or invoice which the council will issue.
Once received, the payment will be logged onto the council’s systems.
Once a financial contribution is received by the council, the service area with the responsibility for delivery of the S106 project will be informed.
The CIL and S106 teams will then regularly monitor the programme and progress to deliver the projects funded through the obligation.
All S106 obligations agreed, payments received from developers and expenditure by the council will be recorded appropriately and reported at least annually to the appropriate committees of the council.
Non-financial obligations
Where a non-financial obligation is required through an S106 agreement, the developer should provide evidence of compliance with the obligation to the council’s CIL and Section 106 team. This evidence would be required in any case should an application be made to discharge the obligations at a later, unspecified point in time.
The delivery of non-financial contributions, or in-kind obligations, will be monitored by the appropriate service areas responsible for project delivery or the CIL and S106 team as appropriate. For example, where there is an Affordable Housing element to a legal agreement, the Affordable Housing Team will monitor this section of the agreement to ensure that it is complied with.
Management fees
A S106 management fee will be charged for each S106 agreement. The fees for this will be reviewed on an annual basis and published separately on the council’s website.
The total fee chargeable and the current fee structure is outlined below:
S106 Fee cap
The fees for each S106 agreement will be capped at no more than 5% of the total value of the financial contributions agreed excluding any fees relating to agreed deeds of variation.
Non-monetary obligations
A fixed charge per head of term will be charged to monitor and manage the discharge of each non-monetary obligation.
Monetary obligations
A fixed charge per head of term will be charged to monitor and manage the delivery of each monetary obligation by the council.
Monitoring fees
A reasonable fee will be agreed upon with the developer on a case-by-case basis depending upon the complexity of the matter being agreed upon.
All management and monitoring fees will be due for payment to the council upon the commencement of the development.
Additional fees related to specific technical activities relating to individual obligations for example but not exclusive to:
- travel plan review fees
- administration of the employment and training scheme
- agreement of a scheme employment strategy
will be agreed separately as part of the negotiations for that particular obligation.
Any revenues generated from the fees will be used for S106 administration, monitoring and management purposes only.
The council will review the fees annually and any changes will take effect from the 1 April for all new agreements, including those approved as “minded to grant” but remain unsigned on 31 March, entered into from that date.
Management fees will not therefore be the subject of indexation as outlined below.
Public art monitoring fee
A monitoring fee will be included in S106s which have artistic obligations. This funds the staff time needed to monitor the public art installation required by the S106.
The fee is calculated at 2.5% of the artistic contribution’s value from the S106.
Monitoring can include, but is not limited to, the:
- agreement and approval of the public art commission methodology
- attendance to any selection panels/appointment interviews of the artist
- support with any communications and enabling partnerships with local community groups, and
- discharge of the section 106 public art obligation once complete
Deed of variation
Following the completion and signing of an S106 agreement, the applicant or the council may find it necessary to modify the contents of the agreement. Additional time, and therefore cost, will be required by the council for the negotiation, preparation, and drafting of such agreements.
These agreements are known as a Deed of Variation or a Section 106A.
Fee scheme
Where the Deed of Variation request is started by, or caused by actions of, the developer, reasonable fees will be charged which vary depending on the complexity of the matter.
This covers:
- the consultation with appropriate services; and
- a planning officer’s time for creating a report which may be determined by the Planning Committee
With effect from 1 April 2024, the following fees for handling any request to vary an S106 agreement are:
Scale of Development | Fee |
---|---|
Requests to vary S106 agreements associated with Householder Developments | £655 |
Requests to vary S106 agreements associated with Small Scale Developments (development that creates up to 499m2 of new floorspace or up to 4 residential units) | £1,795 |
Requests to vary S106 agreements associated with Medium Scale Developments (development that creates between 500m2 and 999m2 of new floorspace or between 5 and 9 residential units) | £3,542 |
Requests to vary S106 agreements on Major and Large-Scale Developments (development that creates between 1,000m2 or more of new floorspace or 10 or more residential units) | £5,160 |
These fees do not include the council's legal costs which our solicitors calculate separately.
Legal costs are payable on completion of a Deed of Variation or closure of the solicitor's file where a Deed of Variation is not entered into.
Any third-party specialist advice the council may reasonably need to procure to independently assess the proposed variation (such as viability advice) is not included in the fee.
Where third-party specialist advice is required, we expect the applicant will meet the costs incurred by the council.
Legal fees
A standard clause within all S106 agreements will require the applicant to pay the council's legal fees for drafting and reviewing S106 agreements, and for reviewing unilateral undertakings whether or not the matter proceeds to completion.
Enforcement
The developer should notify the council upon commencement of development – or when other agreed triggers have been reached. Where the council is not notified of this, and obligations become overdue, the council will seek to enforce the obligation.
From 5 October 2020, standard clauses will be included in the S106 agreement to insert an additional financial penalty where any obligations become overdue.
This is proposed at £500 (minimum) or 5% of the total value of the obligation outstanding. Whichever is the greater amount for the particular scheme where contributions become overdue.
CIL and S106 – Indexation
CIL Indexation
CIL is subject to annual indexation as set out in The Community Infrastructure Levy Regulations 2010 (as ammended).
The Royal Institution of Chartered Surveyors (RICS) CIL Index, based on the Building Cost Information Service’s (BCIS) All-in Tender Prices Index, is prepared and published by BCIS annually. The index figure is published around 1 November each year and is applied from 1 January of the following year.
This is to keep levy rates responsive to market conditions.
The RICS CIL Index from the year BHCC adopted CIL is shown in the table below.
Year | Index | Published |
---|---|---|
2020 | 334 | 28 October 2019 |
2021 | 333 | 26 October 2020 |
2022 | 332 | 25 October 2021 |
2023 | 355 | 24 October 2022 |
2024 | 381 | 23 October 2023 |
2025 | 391 | 28 October 2024 |
S106 Indexation
All financial contributions, except management fees, will be index-linked to allow for the fluctuation of prices between the date the agreement is signed and the date the payment is made.
This is calculated based on the indexation adjustment of the relevant index, from the date the S106 agreement is signed to the expected date of payment.
The additional amount paid on top of the financial contribution adjusts the contribution in accordance with inflation.
The method of indexation will be specified within the legal agreement. This will usually either be the:
- Retail Price Index (RPI) published by the Department of Trade and Industry (DTI) or
- Building Cost Information Service Index (BCIS) published by the Royal Institution of Chartered Surveyors (RICS), depending on the nature of the contribution
The BCIS index will be used for all obligations that are required to fund capital investment projects, such as:
- new classrooms
- replacement boilers
- highways
- infrastructure
No indexation of costs will be applied to any non-financial obligations.