Cliffs

skip navigation and tools

  

The Cliffs between Black Rock and Saltdean

The Undercliff Walk behind the Marina is closed at the moment. This is due to concerns about the stability of the cliffs following the abnormally high rainfall we have had over the last 12 months and recent incidents at other coastal cliffs along the south coast.

Geologists are currently inspecting the cliffs and analysing the chalk and flint that has fallen onto the promenade and been caught behind the cliff netting.

The volume of rain that has fallen has been similar to that which fell in 2000 which was the precursor to unprecedented cliff falls.

The alternative route is through the Marina or over the cliff top.

rottingdean walk

The Cliffs East of the Marina

The cliffs are made up of chalk with isolated flints and flint bands. The chalk was laid down in a warm ocean over 85,000,000 years ago. For a full description of the geology of the cliffs please refer to the Geology page.

undercliff walk roedean

The Cliffs above Asda

Following a series of cliff falls in the Winter of 2000/2001 the council looked at ways of preventing further large scale falls so that the Undercliff Walk could be safely reopened and the future of the A259 safeguarded.

As the cliffs are protected by a number of designations, including Site of Special Scientific Interest (SSSI), it was necessary to discuss the proposals with Natural England.

The expert geotechnical advice that the council received identified 2 areas where physical restraint of the cliffs was necessary. Other areas only required trimming of loose areas of chalk and the construction of shingle beds on the Undercliff Walk to catch smaller falls of chalk and flint.

The first stabilization scheme was completed in 2002 behind the Marina (between Asda and the Mariner's Quay flats). This scheme comprised reprofiling of the top 7 metres, rock bolting and a steel mesh fixed over the face.

The second scheme was to address the stability of the cliffs above Asda. This section of cliffs is not made up of chalk but of an ancient beach material (sandy and chalky with fossil remains) and is consequently very unusual. Natural England viewed the geological value of the site as very high and were unable to support the council's proposals. Their objections to this second scheme led to a public inquiry which was held in January 2004. The Secretary of State's decision allowed the scheme but with modifications. The initial proposal was for a pattern of soil nails with mesh over the face similar to the first scheme, as a result of the public inquiry the scheme was approved but wothout the mesh. 

Prior to the commencement of the works the council paid for and helped to facilitate a full survey of the affected section of cliff face, carried out on behalf of Natural England by the University of Brighton. This is the first time the cliff has been properly surveyed and sampled since its unique value was identified nearly 200 years ago.

Following completion of the works a full and detailed risk assessment was carried out. The results were reported to the council's Environment committee on 26 July 2006. Councillors voted to reopen the Undercliff Walk. On Friday 28 July the Undercliff was reopened.

The cliffs throughout their length will of course continue to experience periods of instability often linked to the weather so there will be times when sections of the Undercliff Walk will have to be closed.

We monitor this natural cliff evolution and promote and support research to help us understand how the cliffs are changing and to maintain safety for everyone around the cliffs.

asda and cliffs

Cliff fall behind Asda in April 2001

The Second Stabilization Scheme

Building work on the coastal defence - scaffolding and digger Erection of scaffolding up the cliff face from which drilling for soil nails took place. Drilling rig and abseilors suspended on cliff face 2 abseilors and a drilling rig suspended down the cliff face to carry out initial drilling for test nails prior to erection of the scaffolding. Two engineers looking at the coastal defense construction

Long reach excavator trimming the top section of the cliff.

 

 

  

  

 

 

 

 

 


Email this page to a friend

To send the details of this page to a friend by email, complete all the details below:

Your details

Please be assured that neither your email address nor that of your friend or colleague will be recorded here, and you will not be placed on any email list simply for visiting this site.

Bookmark this page using:

Find out more about social bookmarking

These sites allow you to store, tag and share links across the internet. You can share these links both with friends and people with similar interests. You can also access your links from any computer you happen to be using.

If you come across a page on our site that you find interesting and want to save for future reference or share it with other people, simply click on one of these links to add to your list.

All of these sites are free to use but do require you to register. Once you have registered you can begin bookmarking.

Brighton & Hove City Council | Kings House | Grand Avenue | Hove | BN3 2LS | Tel: (01273) 290000 | Mail: info@brighton-hove.gov.uk | how to find us | comments & complaints